盐城附近的女人电话-盐城附近的女人电话

东莞附近有没有服务

Company news
The operation of the cooling tower has the following requirements: the oil level of the reducer should always be checked. It is recommended that lubricants be used, using 22 to 28 hypoid gear oils or 90 to 120 industrial gear oils. Big oil. After 20 days of operation, drain the oil and replace it with new oil. It is suitable for the waterproof and anti-seepage of the inner wall of the cooling tower. It has excellent heat and moisture resistance, aging resistance and waterproof performance. It is suitable for the surface construction of low temperature and humidity. It can meet the requirements of the cooling tower with the formwork turning over and brushing. This product can also be used for corrosion protection of steel surface. Based on the systematic investigation on the construction technology level, anti-corrosion technology, materials and equipment of pipeline overhaul in foreign countries, especially in North America and Russia, it is considered that the investigation results can be used to introduce foreign advanced repair technology, mechanized repair equipment and products to China.

Back to the top